• ¡Welcome to Square Theme!
  • This news are in header template.
  • Please ignore this message.
Hello There, Guest! Login Register


Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
20 use techniques of diamond tools
#1
Drilling machine is a simple, convenient, economic driving machine, is important quarry stone machine, belongs to the impact equipment.types of landscaping stone walls At the same time to oil, a variety of auxiliary medium of water vapor with the use of, on the one hand, the reliability of the equipment work, safety proposed higher requirements; on the other hand, but also to equipment operation and maintenance difficult.landscaping stones for sale Scientific use and maintenance of drilling machine, not only to ensure the safety in production and to prevent accidents has important significance and to improve equipment performance, service life, production efficiency has important significance.
Pre boot preparation
1, the purchase of new drilling machine,landscape stones for sale coated with antirust grease viscosity inside the large, clear before use must be removed. When heavy, the moving parts of the table Mina to be coated with lubricating oil. After installed, will drill through compressor pipeline, open wind operation, check the operation is normal.
2, to automatic lubricator grease, commonly used lubricating oil for 20#, 30#, 40# oil. Containers of lubricating oil should be clean, cover, prevent rock powder and dirt into the oiler. stonegroupon
3, the big check work place the wind pressure and the water pressure. The wind pressure is 0.4-0.6MPa, pressure too high will accelerate the damage of mechanical parts, low drilling efficiency and can reduce the corrosion of mechanical parts. Water is generally 0.2-0.3MPa, high pressure, water will poured into the machine internal damage lubrication, reduce drilling machine efficiency and the corrosion of mechanical parts; low flushing effect is bad.
4, the use of Qianzai whether meet the quality requirements, prohibited the use of substandard qianzai.
5, the wind pipe connected to drill, will blow off the dirt should be deflated. To meet the water pipe, the water is to be waterproof to the dirt, the wind pipe and water pipe must be tightened, in case of falling off.
6 and the shank insertion drilling head, forced clockwise rotating drill, if not to move, indicating that machine is jammed phenomenon, should be promptly dealt with.
7, tighten the connecting bolts, open the wind to check the operation of the propeller, the normal operation can start work.
8, guide rail type drilling machine should frame the pillar, and check the thruster operation, an air leg drill and to type drilling machine must check the air leg of the flexibility of the.
9, the hydraulic rock drill should hydraulic system has good seal, to prevent the pollution of hydraulic oil to ensure the pressure of the hydraulic oil is constant.
Work time attention
1, his eyes should be rotated slowly, after the hole depth is up to 10-15mm, and then gradually into full operation. In the process of drilling, according to the design of the drill hole straight forward, and is located in the center of the hole.
In 2, when the drive shaft thrust drilling should be reasonable. Thrust shaft is too small, the machine generated rebound, increasing vibration and reduce the drilling efficiency; axial thrust too greatly, drill top tight fundus, so that the machine under the condition of overload operation, easy premature wear parts, drilling speed slowed down.
3, rock drill jamming, axial thrust should be reduced, you can gradually become normal. If invalid, stop immediately. First use the wrench slowly rotating the drill rod, and then open the pressure Qianzai slowly rotating, forbidden processing with beating rod method.
4, often observe the powder. Fly is normal, the mud along the orifice slowly outflow; conversely, a strong blow hole. If you are still valid, should check the status of drill hole and shank, then check the water needle, replace the damaged parts.
5, to observe the oil reserves and oil, adjust the injection quantity. Easy to premature wear of the parts without oil. When the oil is too large, it will cause pollution of the working surface.
6, operation should pay attention to the sound of the machine, observe the operation of the situation, find the problem, timely processing.
7, pay attention to the drill working state, abnormal timely replacement.
8, the operation of stoper should pay attention to prevent the volume of air leg drill, swing up and down the accident. Support points to be reliable. When holding the machine can't ride more tight gas leg to prevent the damage of machine.
9, attention should be paid to the rock, avoid perforated along bedding, joints and cracks, banning residual eye, always observe the roof and rib fall risk.
10, to effectively use the open hole. In the drilling process, there is an important link is to open hole, the hole is used to reduce the impact of the pressure and the fixed pressure to complete the. The pressure should be as small as possible so as to make a hole in a very large rock face, but also to avoid bending of the drill pipe.
 
Reply
#2
car repair costs
 
Reply
  


Forum Jump:


Browsing: 2 Guest(s)